The third set of locks is scheduled to be presented on October 21, 2014 as planned, said Grupo Unidos por el Canal de Panamá (GUPC).
Despite the strike of workers at GUPC, the consortium which is designing and building the third set of locks, the consortium and the Panama Canal Authority (ACP) said that the work will be finished on time.
“The third set of locks is scheduled to be completed on October 21, 2014 [...]
English
Español
To read online or download the latest edition of